VIEW FAILING TOWER SITES IN OK. REAL POOR CONSTRUCTION, YOUR WONT BELIEVE THIS!
6 INDIVIDUAL GEO TECH REPORTS PROVIDED TO STEVE LARKIN AT HILL RADIO. REPORTS NOT PROVIDED TO RADIAN/ROHN FOR ENGINEERING FOUNDATION DESIGN?
RADIAN/ROHN DRAWINGS TOWERS DO NOT MEET LOADING! 4 MONTHS LATER ROHN REVISES. THEY STILL FAIL!
DRAWINGS RADIAN/ROHN FAIL LOADING...
PAUL J. FORD REPORTS: TOWERS FAIL DESIGN ENGINEERING.
FOUNDATION AND TOWER INSTALLATION FAILING TOWER ENGINEER REPORT. DAVINCI ENGINEER REPORT, TOWER INSTALL CRITICAL ISSUES
MAJOR PROBLEMS WITH FOUNDATION INSTALLATION, UPDATING THIS FILE DAILY AS REPORTS COME IN.
MAJOR ISSUES WITH TOWER PURCHASE HILL RADIO BAIT AND SWITCH.
COMMUNICATIONS CONSTRUCTION WORK SCHEDULE, TOWERS WERE TO BE INSTALLED IN TWO WEEKS
TOWER PRO COMMENTS ON CONSTRUCTION
COMMUNICATION CONSTRUCTION LLC (STEVE LARKIN) IMPROPERLY INSTALLED FAILING FOUNDATIONS. SEACOMM ERECTORS STATES WORST THEY HAVE EVER SEEN, AND NEED NEW FOUNDATIONS. PIER DRILLER INC. STATES "WORST THEY HAVE SEEN, AND NEED TO COME DOWN". DON DOTY, STAINLESS LLC, STATES: "TOWERS HE REVIEWED "NEED TO BE REMOVED AND NEW FOUNDATIONS".
JUST
ONE OF THE MAJOR ISSUES WE HAVE WITH THE ABOVE COMMUNICATION
CONSTRUCTION INSTALLATION. MAXIMUM PIER EXPOSURE: "NO MORE THAN 6"
OF PIER EXPOSED ABOVE GROUND LEVEL.
SOIL COMPACTION SPECS MANDATORY FOR STABILIZATION." WE ALLEGE THE ABOVE ALBEIT TO BEEN PROVEN IN COURT . Phone: (360) 474-8991 sales@usedtowers.comLanda and Associates, INC PHOTO EXAMPLE: TOWER FOUNDATION FAILURE DUE TO: LACK OF CRUCIAL OVERBURDEN SOIL TO STABILIZE TOWER. |